Cathedral View

Contractor: DW Hicks
Construction Value: £16 million
Developer: Prosperity Capital

326 Studios across 2 blocks for this Student Accommodation scheme.

Design MEP provided Stage 4 Mechanical, Electrical and Public Health design with Client checking role.

The project incorporates a central plant room within block 2 which comprises a gas-fired CHP and high output boiler for the hot water generator.

The development is electrically heated and achieves an EPC rating of B. The Student Accommodation has been designed to achieve BREEAM Very Good.